Sonar Telematics OBD2 GPS tracker and vehicle tracking app displaying real-time location, trip mileage, fuel level and engine RPM for small business fleet management.

Tracking Made Simple, Anytime You Need It

Real-Time GPS Tracking, Vehicle Monitoring, and Remote Engine Diagnostics.

SONAR TELEMATICS GPS TRACKER

$49 | Shop Now
Customers rate us 4.8/5 based on 65 reviews.
CONNECTED DRIVE

In-depth Vehicle Information

OBD-II GPS tracker showing live engine coolant temperature and overheating detection
Real-time fuel level monitoring with an OBD-II GPS tracker to improve fuel efficiency
OBD-II GPS tracker displaying real-time car battery voltage and battery health

Features you'll love:

ALL-IN-ONE FEATURES

  • Connected car platform displaying live vehicle diagnostics, trips, fuel level and battery status

    Embark on a thrilling journey with our OBD2 GPS tracker. Stay on top of engine health, battery diagnostics, fuel consumption, and more. For a truly exhilarating ride!

  • Vehicle diagnostics dashboard showing fuel level, battery voltage, coolant temperature and RPM

    Unlock insights with our visual engine variables display. Discover trends with clear charts of high, low, and average values.

  • Live vehicle tracking with real-time GPS location and speed monitoring

    Stay informed about your vehicle's whereabouts with our precise mapping feature. Access real-time data on location, speed, and more.

  • GPS trip history showing driving routes, mileage and trip details on an interactive map

    Track every detail of ongoing or previous routes taken, ensuring you are always informed about the actions of your employees or loved ones.

  • OBD-II engine diagnostics showing active fault codes, DTC history and vehicle health information

    Stay ahead of potential issues with our cutting-edge Sonar Telematics GPS tracker. Monitor engine health and avoid breakdowns proactively.

  • GPS tracker app displaying real-time vehicle notifications for speeding, maintenance and driving events

    Enhance your safety measures with our advanced system utilizing real-time alerts for driving events and detecting any unauthorized access to your devices.

Fleet Management Solution

Connected Fleet

  • Real-time fleet tracking dashboard showing vehicle location, trips and engine diagnostics

    Fleet View

    Real-time updates, Speeding, Driver Behavior, Idling, alerts and much more.

  • Fleet trip history dashboard showing GPS routes, trip summaries and driving activity

    Trips History

    Review trips to confirm timely delivery and eliminate discrepancies, view maximum speed and engine idling time.

GPS tracker pricing with monthly subscription, real-time tracking and vehicle diagnostics

connect now!

Budget-friendly subscriptions that simplify everything for you, with no activation fees.

Shop Now →

SIMPLE. SMART.

Tech Specifications

Precision engineered for seamless tracking and vehicle diagnostics. Discover the power within the compact design.

4G LTE CAT-M

Reliable high-speed communication network.

GPS & BDS

Dual-mode precise global positioning.

Plug & Play

Effortless installation in seconds.

OBD Diagnostics

Real-time vehicle health monitoring.

Tamper Alert

Instant detection of unauthorized removal.

Backup Battery

50mAh / 3.7V for emergency power.

OBD2 GPS tracking device for live vehicle location and engine diagnostics

Frequently Asked Questions

What is a GPS OBD2 tracker?

It is a compact device that plugs into your car's OBD2 port, providing real-time tracking and diagnostic information.

How does the OBD2 GPS device work?

The device communicates with your car's onboard computer, retrieving data about engine variables. It then transmits this data to our connected app.

Do I need technical expertise to install the device?

No, the installation process is usually straightforward. Just plug the device into your car's OBD-2 port, and it's ready to use.

What happens if the device gets unplugged?

After the device is unplugged, you will receive a notification indicating this. The device will continue sending location data for approximately an hour, thanks to its internal battery. You will also be notified when the device is plugged back in.

Can I use this for my company vehicles?

Absolutely, the Sonar Telematics OBD2 GPS device is an excellent solution for businesses managing fleets, enabling real-time tracking, route optimization, and performance analysis.

Is it suitable for families?

Yes, the Sonar Telematics OBD2 GPS is ideal for families, helping parents keep track of new drivers, ensuring safety, and monitoring overall vehicle health.

How much does the subscription cost?

Subscription is $7 per device, billed monthly to your preferred payment method.

Can I cancel my subscription at any time?

Yes, you can cancel your subscription at any time without facing long-term commitments.